Hi all,
Is it at all possible to copy events in one project to another project. I have my new game in one project and have been using another project to test variables, just so I don't break the game. No without having to do all the work again I was wondering if this was possible. I have tried it and it doesnt seem to work, a pop up box states that items/objects are missing. I tried pasting objects from one project to the other and amazingly that worked, but the events refused to be pasted.
Am I doing something wrong or is there a way to make an include file.
Thanks
John